* New Product
Line
* Video Link
at Bottom of Page
Press Release / For Immediate
Dissemination
USPTO Issue:
US Patent No. 7,104,316
US Patent No. 7,559,360
US Patent No. 7,690,281
Attorney: Lance A. Foster
Firm: Jones, Walker, Waechter, Poitevent, Carrere & Denegre, L. L. P.
New Technology for the Oil and Gas Industry
Record Performance: 232 Days !!!
Houma, LA USA – January 18, 2011 - DO you need to run and trip heavy
weight drill pipe? Then you need to inquire at
Hobco, Inc.about the MANTIS System; the “Iron Tool Pusher” designed to position Clincher DPT's and
put into motion by the staff at HOBCO, Inc. Whether drilling a new hole, working over or decommissioning a well, the patented
“Iron Tool Pusher” will save significant rig time, reduce crew fatigue and prevent injuries.
Further, the Mantis System handles and positions most cable suspended Mud Buckets and other tools on the Rig
Floor.
No newcomer
to the Oil and Gas industry, HOBCO sports nearly thirty years of successful know-how with High Torque Power Tongs: Clincher
5.5" UHT through Clincher 9 5/8" DPT / XHT. Further to previous patents, the USPTO recently issued, as part of the MANTIS
System, Patent 7,690,281 April 6, 2010; The addition of the Mantis Crossbow to the MANTIS System further
sets out the safest, most efficient and user friendly Tong Positioning System available to the oil and gas industry. According
to those who have used the MANTIS System, the Iron Tool Pusher offers the safest and most efficient method
of handling cable suspended Drill Pipe Tongs, Casing Tongs and Mud Buckets.
As reported
by Paul Hobgood, President and CEO of Hobco, Inc. and Managing Director of The ORCA Group, LLC, the most frequent query concerning
the MANTIS relate to the following:
1. ‘Floor space required?’ The MANTIS has only a twenty-five inch footprint. This clearly
sets the parameters while positioning Power Tongs and Mud Savers. Land Location: Clearly the MANTIS System is safe and efficient; the
MANTIS may be run from trailer, flat bed truck, rig floor cantilevered beam adapter or other configuration as set out by the
drilling team and further determined by rig type, rig size and location.
2. RECORD RUN: *Since 2005 the
longest continuous - running job: 232 days - no lost time, no injuries,
no reportable incidence while tripping six and eight
inch heavy weight drill pipe using Clincher DPT's to a TD of 19,146 feet. Rig: Todco 64; Location: Gibson, Terrebonne Parish, LA, United States of America.
3. ‘Daily costs of the MANTIS’? The
cumulative savings is significant: Limits crew fatigue; reduces injuries; improves rig efficiency. Please inquire: 1.985.879.4466
or sales@hobco-orca.com .
4. Conclusion: The MANTIS Positioner, with proven history, saves rig time and reduces fatigue of floor
personnel while virtually eliminating injuries associated with Hydraulic Power Tongs and Pneumatic Mud Buckets.
For information: http://www.hobco.com; Contact: Sales@hobco-orca.com